A wet skylight is often not a leaking skylight. Separating a genuine seal failure from condensation and from a curb flashing problem decides what actually needs doing.
The useful first question is when the water appears rather than where. Condensation peaks on cold, still, dry nights; a curb flashing fault tracks rain and wind direction; a failed glazing unit ignores both and simply gets worse. Establishing which pattern fits takes a few days of observation and costs nothing.
Two of the three causes need no roof work at all. Ruling them out first is what prevents an unnecessary repair to a skylight that was never leaking.
A wet skylight is one of the few roof complaints where the most likely answer needs no roof work at all. Ruling the other two out first is what stops an unnecessary repair.
A skylight is the coldest surface in a warm, humid room. Water forming on the inside of the glass and running down the reveal appears in cold weather, is worst in kitchens and bathrooms, and stops when the room is ventilated. No roof work will change it.
The unit itself has failed — misting between panes, water at the glazing bar. This is a window fault rather than a roof fault, and it is solved by the unit, not by the roof around it.
The skylight sits on a raised curb, and that curb is flashed into the roof like a small chimney: apron at the bottom, steps up the sides, head flashing at the top. Water entering here appears at the corners of the reveal and is worst in driven rain from one particular direction.
Condensation is worst on cold still nights with no rain at all. A curb flashing leak tracks rainfall and wind direction. A failed unit leaks regardless of both. Establishing which pattern fits takes observation, not a ladder.
Density is the governing factor. Buildings this close share roof lines and drain into narrow gaps, rear additions tie into main roofs at shallow pitches, and downtown blocks are effectively one roof divided by parapets. Almost every leak starts at a junction between two things rather than in the middle of one.
Passaic's only land border is Clifton; Garfield, Wallington, Rutherford and East Rutherford are all across the Passaic River, reached by the Monroe Street, Passaic Street, Gregory Avenue, Market Street, Eighth Street and Union Avenue bridges.
Passaic is built at over twenty-two thousand people to the square mile on just over three square miles of land, in a stock of 21,513 housing units that is overwhelmingly pre-war — closely set two- and three-family houses, wall-to-wall commercial blocks downtown, and rear additions on almost everything.
All areas coveredUseful to know before accepting any quote, because a scope that ignores these is a scope that will have to change later.
New Jersey adopts a single Uniform Construction Code and municipalities may not set lesser or greater technical requirements. A repair specified correctly in Passaic is specified correctly in Clifton.
Replacing more than a quarter of a roof surface within any twelve-month period triggers a full construction permit. Splitting one job into two smaller ones inside that window does not avoid it.
Northern New Jersey sits in the design zone where an ice barrier is required, running from the eave edge to at least twenty-four inches inside the interior wall line. On older roofs it is frequently absent, which shows up as recurring winter leaks at the eaves.
In Passaic the Uniform Construction Code is enforced by the city's Division of Code Enforcement, which is where permits for qualifying roof work are issued.
Sections of Passaic first, then the surrounding municipalities.
Answers are general guidance about how these roofs behave, not a survey of any particular building.
Probably not. Condensation forms on the coldest surface in a warm humid room, which a skylight usually is. It is worst on cold still nights and improves with ventilation. A genuine leak tracks rainfall and wind direction instead.
Access is the constraint, not the roof. At this density there is often no safe ground position for a ladder, so the roof has to be reached from inside the building or from a neighbouring one, and that has to be arranged before anyone can even look properly.
Only if more than a quarter of the roof surface is replaced within a twelve-month period — that is the threshold under the New Jersey Uniform Construction Code. Most targeted leak repairs sit well under it, but the scope decides, not the label on the job.
Describe what you are seeing and when it started — that is usually enough to narrow the cause before anyone climbs anything.